This is laboratory equipment built around one job: releasing a measured amount of ignition energy into a test mixture, and letting the researcher change that amount as the programme moves. It is not a unit pulled off a shelf at a fixed specification. As an industrial ignition testing equipment supplier, we assemble each bench for the project it will serve, so the energy-storage arrangement, the way levels are selected and the way the discharge reaches your test vessel are settled with you before the build begins.
That way of working suits groups whose studies sit close to ignition and explosion: how much energy a gas mixture or a dust cloud actually needs before it lights, whether a given condition will ignite at all, and how one condition compares with the next. The discharge is the controlled variable on this bench; the vessel, the pressure, the instrumentation and the analysis stay on your side of the interface.
An ignition system test rig for explosive testing of this kind lives in the laboratory, on a bench or a dedicated test stand, and it is run by the person conducting the experiment rather than by a plant operator on shift. Controls are on the front of a compact white case, connections are brought out to the panel, and the parts you handle are reachable without opening the unit up.
Because every bench is configured to order, the important conversation happens before the order: which energy levels you work at, how many you need to move between, and what the bench has to connect to. Bring those three answers and the rest of the specification follows from them.
The front of the unit is where the experiment is run, so the panel is laid out to be read at a glance. A pair of push buttons — one red, one green — sits at the top with a black label slot above each, so a button can be marked with the function it carries on your bench instead of relying on memory or a strip of tape. A metal rotary knob sits alongside for adjustment during a run, and the front face also carries a 24 V supply input, an on-board fuse and an SV trigger point.
Wiring leaves the case through circular panel connectors rather than a fixed tail. That matters in a working laboratory: the discharge lead can be changed, extended or replaced without opening the enclosure, and the bench can be moved or re-sited without unsoldering anything. A damaged lead becomes a plug-in replacement rather than a workshop job.
The enclosure is a rectangular white case with the controls front-mounted, which keeps the working face of the bench clear and the cable runs tidy. The build is industrial rather than decorative, as befits an ignition system test rig for explosive testing — metal panel hardware, panel-secured connectors, and a fuse you can reach from the front so a fault in the control circuit is dealt with where you are standing.
Because the layout is agreed with the project, the wording on those label slots and the job each button does follow your procedure. If your test sequence needs a particular button to perform a particular step, that is part of the specification conversation rather than something you adapt to after delivery.
| Model | TYST-2 |
|---|---|
| Equipment type | Ignition energy test bench, laboratory use |
| Build basis | Configured to the project |
| Energy storage | Selectable storage setups, chosen at build |
| Level changeover | Fast switching between energy levels |
| Ignition energy | Set to the test requirement |
| Intended work | Ignition and explosion studies |
| Panel controls | Red and green push buttons with label slots, rotary adjustment knob |
| Panel connections | Circular connectors, 24 V supply input, fuse, SV trigger point |
| Enclosure | White rectangular case, front-mounted controls |
| Quality standard | Q/TYQ 01-2021 |
Routine care on a bench like this comes down to three things: the electrode, the discharge lead and the earth. Before a session, check that the electrode faces are clean and set to the geometry your procedure calls for, that the discharge lead is undamaged along its whole run, and that the bench and the test vessel are earthed the way your laboratory requires. A contaminated or rounded electrode changes the discharge before anything else on the bench does.
Keep the discharge lead dressed away from signal and data cables rather than bundled with them. The most common source of confusing readings on a bench like this is a discharge lead lying across a recorder input cable; route it on its own, as short and as direct as the layout allows.
Record the energy level next to every run, in the same notebook or file as the measurement. A result without its stored-energy setting cannot be reproduced or defended later, and that setting is the one variable this bench puts under your control.
Between sessions, keep the panel face clean and dry, leave the fuse accessible, and store spare electrodes and a spare lead with the bench rather than in a general stores bin. Electrodes are consumables: when the spark becomes irregular at a level that used to be stable and cleaning does not bring it back, change the electrode before suspecting the electronics.
Have the bench checked against your reference at whatever interval your quality system sets, and keep that record with the unit. If a reading drifts, work through earth, lead, electrode and fuse in that order before opening the case — those four account for most of the problems a laboratory ever sees. Plan the space around the bench with the panel reachable and the lead free to run to the vessel, and tell us the layout before the build is finalised so the lead length suits the room it will live in.
All three benches in this range are built to the same enterprise standard, Q/TYQ 01-2021, and all three are assembled to order. The choice between them is not a question of price tier or build quality — it is a question of control mode, decided by how your test series moves rather than by the size of the budget.
Where the programme needs to sit at a precise energy and then move in fine increments, TYST-1 is the bench to specify: storage voltage is adjusted smoothly and energy follows continuously, with no step limits between settings. Where the series steps between a handful of defined levels and the priority is getting from one to the next quickly, TYST-2 is the match, with several storage setups living inside one enclosure and fast changeover between them. Where the variable under study is how often the discharge occurs rather than only how strong it is, TYST-3 is built around adjustable discharge frequency, with the ignition energy configured to the scenario.
Reading the three as one family rather than as competing models is the point. A laboratory that later shifts from fixed-level comparison to frequency work is not starting again from another supplier's catalogue; the same build team, the same standard and the same panel conventions carry across the range. A laboratory that orders the wrong control mode, on the other hand, spends its instrument time working around the bench instead of with it — which is why we ask what your series looks like before anything is specified.
Three answers pick the bench: the energy levels you work at, whether you step between a few set levels or need continuous adjustment, and whether discharge frequency is a variable in the study. Tell us those, and the model follows. If your programme spans more than one of these patterns, say so at the enquiry stage — the configuration conversation can cover it, and where one bench cannot carry both, we will tell you which pattern to start with and what the second bench in the range would add.
Not every buyer arrives knowing which item in the range fits. Tell us what the part has to do, the space it goes into and the supply you have, and our engineers check it against the specifications we publish and tell you which model matches — and when a standard item will not do. The same team designs, builds and tests the products in our own plant in Shaanxi: 28 people, 16 patents, national high-tech enterprise status, in business since 2018. They answer questions before you order, stay reachable afterwards for fitting questions and fault-finding, and take custom or non-standard requests directly.
Yes. The ignition energy is set to the requirement rather than fixed at the factory, and every spark ignition energy test bench we build is arranged around the levels you give us. You tell us the energies your programme works at and the storage configuration is chosen so the bench can reach them. If the work later moves outside what was built in, talk to us first — changing the storage arrangement is a build-level change, not a dial adjustment.
Changing level is a quick operation on this bench, which is the reason the model exists. A series that steps through several levels can be run in one session without breaking down the rig and rebuilding it between runs. The exact procedure follows the configuration agreed for your project, and it is settled with your operator as part of the build rather than left to trial and error.
The three benches answer different experimental needs. This one is built around selectable energy-storage setups with fast changeover between levels, which suits a programme that steps across several energies. TYST-1 is the version to look at when you want smooth, continuous control of storage voltage and energy with no step limits, and TYST-3 puts the emphasis on adjustable discharge frequency. If you are unsure which pattern matches your test plan, describe the plan and we will tell you which bench fits it.
The front panel carries an SV trigger point alongside the supply input and fuse, and the discharge is commanded from the panel. Synchronising a recorder, oscilloscope or camera is handled through the signal connections agreed when the bench is built, so tell us what your equipment needs to see and the interface is matched to it. The timing of the discharge against the recording window is usually the first thing a researcher raises, so this is settled at the specification stage rather than after delivery.
The bench is built to Q/TYQ 01-2021, the enterprise standard covering this range, and that reference is the one to quote in a procurement file. We work to that document through build and final check, and we will confirm which quality documents can travel with the unit if your institution needs them on file.
Plan bench space with the front panel reachable and enough room to route the discharge lead to your vessel, a 24 V supply for the panel circuit, and earthing for the test rig as your laboratory requires. Tell us the space you have and the layout of the vessel port before the build is finalised — the enclosure arrangement and the lead length are agreed for your project, so a late change to the room is worth raising early.