• Gas turbine high-energy igniter with built-in thruster,MY SHOP,Gas turbine high-energy igniter with built-in thruster
  • Gas turbine high-energy igniter with built-in thruster,MY SHOP,Gas turbine high-energy igniter with built-in thruster

Gas turbine high-energy igniter with built-in thruster Telescopic mechanism long-term temperature resistance 400℃

When you look at this component, you're really seeing a mix of engineering details and practical design. What does it include? Well, there's a high-energy igniter, an ignition cable, and a semiconductor igniter plug, which even has an actuator built right in. This setup does all sorts of automatic things, like managing chamber pressure for propulsion as well as retraction. People often use it to take the place of some imported models
Download
View all downloads
  • Gas turbine high-energy igniter with built-in thruster,MY SHOP,Gas turbine high-energy igniter with built-in thruster

Description

Product Overview

The gas turbine high-energy igniter with built-in thruster is a complete start-up assembly, not a bare ignition part. One machined body carries the high-energy igniter, its ignition cable and a semiconductor igniter plug, and the actuator that drives the plug forward is built into the same unit.

That integration is what decides how the unit behaves on the casing. A turbine plug cannot sit in the combustion zone the way a fixed burner igniter does: it has to travel in for light-off and come back out once the flame is established. Because the thrust side and the ignition side are one assembly, the stroke, the sealing faces and the spark position are set at build instead of being lined up on site between an igniter and a separate air cylinder.

It fits the machines operators actually run — power generation turbines, mechanical drive units, and the service shops that overhaul them. Plants holding an imported igniter they can no longer source easily use this assembly as the replacement, and overhaul teams fit it during planned work so the start behaves after the outage the way it did before.

Day to day there is nothing to handle. The unit works when the start sequence calls for it, and between starts the plug rests inside the body rather than in the gas path, which is also what protects the plug and the mechanism. First-article approval usually turns on the mounting interface and the stroke rather than on ignition energy.

Start Sequence

  1. Start command. The control system calls for ignition and the assembly begins its stroke. This is the whole brief of a gas turbine igniter for turbine startup: a reliable spark at the right depth in the chamber, seconds after the command.
  2. Extension. The built-in actuator drives the semiconductor plug forward through the casing into the combustion chamber. Travel is set when the unit is built, so the spark face arrives at the light-off position.
  3. Discharge. The high-energy igniter charges and discharges through the ignition cable, and the spark breaks across the semiconductor ceramic face at the plug tip.
  4. Light-off. Fuel is admitted and the flame establishes. The igniter keeps firing until the flame signal is stable and the sequence moves on.
  5. Retraction. The actuator draws the plug back out of the combustion zone into the body, clear of the flame it has just lit.
  6. Sealing. With the plug home, the casing joint closes again and the unit sits sealed until the next start.

Actuator & Telescopic Mechanism

Extension and retraction come from the built-in thruster: a pneumatic actuator housed inside the assembly. Air drives the movement, so the ignition end does not depend on a separate cylinder and linkage bolted on beside it.

The stroke is telescopic. The plug travels out of the body and returns into it, and the unit stays compact when retracted. On the machine that means one mounting point and one insertion line to set, instead of an igniter, a cylinder and a coupling that all have to agree with each other.

Chamber pressure is managed inside the unit as well, across both the propulsion and the retraction part of the stroke. The turbine start sequence asks for ignition; it does not have to balance the actuator against a chamber pressure that is still climbing.

Repeated heating is what freezes threaded ignition parts in place. The threaded and joined sections here are made so they will not lock up or seize, which keeps removal and inspection predictable at the next overhaul rather than turning a plug change into a cutting job.

Because the igniter, the cable, the plug and the actuator come from one gas turbine igniter manufacturer, a change to the stroke, the mounting face or the sealing arrangement is settled on the drawing instead of being reconciled between three suppliers.

Heat, Pressure & Leak Integrity

  • No gas leakage at 4 MPa. On a gas turbine high-energy igniter the casing joint is a pressure part, not just a mount, and this plug holds it with no gas leakage at that pressure.
  • No leakage at 1.5 MPa with the plug extended. The seal still holds with the plug pushed out into the chamber, so a start that is aborted mid-sequence does not turn into a hot-gas leak.
  • 400 °C, long term. The extension mechanism is rated to keep working at 400 °C continuously rather than for a short excursion, which is what lets the actuator side live in a hot casing zone without a cooled enclosure or a heat shield to maintain.
  • High-temperature alloy at the hot end. The igniter plug is made with an alloy chosen for the temperatures inside a turbine casing, so the spark end keeps its form while it is extended.
  • Seizing resistance under heat cycling. Every start heats the plug and every shutdown cools it; the threaded joints are made so that cycle does not weld them together.
  • Why the pressure figures matter. Hot gas escaping around an igniter port is a walk-round safety item and a reason for forced outage, not only an efficiency loss. Check both ratings against your chamber conditions before ordering.
  • What to send with the enquiry. Give the chamber pressure at the igniter port and the casing temperature where the unit mounts, and the ratings are checked against your duty before the drawing is agreed.

Replacing an Imported Unit

  1. Identify the machine. Note the turbine make and model, the casing drawing number if it survives, and the nameplate details of the igniter coming out.
  2. Measure the interface. Mounting face and bolt pattern, insertion depth, and the stroke the old unit travels. Those three decide whether a replacement behaves like the original.
  3. Record the duty. Chamber pressure at the port, casing temperature where the unit sits, and what air supply the plant can put to the actuator.
  4. Send the drawing, or the part itself. Where no drawing survives, we work from the removed unit and set the stroke and sealing faces to match. That is how a gas turbine igniter for turbine startup is matched to a machine that is already running rather than to a catalogue number.
  5. Agree the control interface. How the start sequence calls for ignition, where the ignition cable runs, and how the air is switched. Settling this on paper stops a bracket and a cable route being improvised during the outage.
  6. Check the first article. Before the machine goes back together, compare the new unit with the old one on the casing: stroke, insertion depth, sealing face and cable route.

Specifications

ConfigurationHigh-energy igniter, ignition cable and semiconductor igniter plug in one assembly
ThrustBuilt-in pneumatic actuator, extension and retraction
MechanismTelescopic; plug withdrawn from the combustion zone between starts
Chamber pressureManaged automatically by the assembly during the start sequence
Igniter plugSemiconductor type, high-temperature alloy construction
BodyMachined cylindrical body with a flanged mounting face
MountingCasing-mounted, threaded and joined sections
DutyGas turbine start-up
BuildStroke, insertion depth and plug position set from the casing drawing

Certifications & Compliance

Two builds of this assembly are available, and the difference between them is compliance, not ignition performance. The standard build is the unit described in the specifications. One variant is built to line up with Q/TY 002-2023 and is supplied with explosion-proof certification. That certification belongs to the certified variant only; the standard build does not carry it, and no certificate should be assumed for a standard unit.

Match the variant to the installation. If the igniter port sits in a hazardous area, or your plant specification calls for explosion-proof equipment at that location, quote the certified variant. A regulated installation needs the certified build, not the standard one, and the certificate has to belong to the unit that arrives rather than to the assembly family in general.

Put the standard on the enquiry. State Q/TY 002-2023 in the enquiry if your engineering department has adopted it, and say what the paperwork has to do: travel with the shipment, name the assembly and drawing number, or be issued in a particular language. These points are settled before release.

Confirm the scheme your site works to. Explosion-proof certification is the only certification supplied with this assembly; beyond it, no other certification is claimed. If your site works to a different scheme, tell us at enquiry. Where the assembly cannot be supplied against that scheme, we will say so before the order rather than let the paperwork fail at inspection.

Keep the certificate with the turbine records. File it with the assembly drawing and the plug renewal history so the next audit or insurance inspection can trace the certified unit to the installation.

Do not carry the claim across the range. The Q/TY 002-2023 reference and the explosion-proof certification apply to this turbine igniter variant. They are not a blanket statement about every gas turbine high-energy igniter, plug or nozzle we make; each product is quoted on its own compliance position.

Ordering & Delivery

  • Quotation follows the drawing. Units are priced per assembly, so the drawing, stroke and mounting face come first. Every unit leaves as a matched set from a gas turbine igniter manufacturer working to your drawing rather than to a stock number.
  • Lead time. Ask your sales contact to confirm current lead time once the drawing is agreed; an assembly built to an existing drawing and one that needs a new mounting face do not take the same time.
  • Payment and shipping terms. Agree payment terms and Incoterms with your sales contact before the order is released, and say whether the unit travels by air or by sea.
  • Packing. The plug tip and the sealing faces are what suffer in transit, so tell us the mode of transport and the packing is agreed to suit it.
  • Documents. State at enquiry which papers your plant needs to travel with the shipment — drawing set, packing list and any certificate copies — so they arrive with the unit.
  • Spare plug. Confirm spare plug availability when you order, quoting the assembly number so a replacement matches the build.
  • Records. Keep the assembly drawing with the turbine records, so a later plug renewal references the right build.

Technical Support & Model Matching

Selection decides how well a part performs in service, so our engineers work through it with you. The team comes out of aviation and military ignition work, bringing 18 years of accumulated expertise to the designs we build. Send your operating conditions, a drawing or a worn sample; we help match the model, check interface details and flag anything that will not fit before you order. Because we manufacture in-house from core components through final testing, modifications stay under our control. Installation, commissioning and troubleshooting support continues after delivery.

FAQ

How do I know when the semiconductor plug needs renewing?

Plug wear shows as a spark that becomes weaker or less consistent, and on a gas turbine high-energy igniter it usually appears first as a start that needs a second attempt. Inspect the ceramic spark face at each overhaul: an eroded glaze or a pitted face means the plug has reached the end of its life.

What does the assembly need on site — compressed air, power, or both?

Both, but only the ignition side is electrical. The extension is pneumatic, so a gas turbine igniter for turbine startup needs a clean, dry air supply and a switched air line at the casing; the high-voltage feed reaches the plug through the ignition cable that comes with the assembly. Air pressure and connection size are fixed with the drawing, so tell us what the plant can supply before the unit is built.

Is the ignition cable a fixed length, or does it follow the turbine layout?

It follows the layout. The cable is part of the matched assembly, so its length and the way it leaves the body are agreed on the drawing along with the stroke and the mounting face. Give us the route from the igniter port to the ignition unit, including any bend the casing forces, when the unit is specified.

Which version carries the explosion-proof certification?

One variant of this assembly is built to Q/TY 002-2023 and is supplied with explosion-proof certification; the standard build does not carry it. Tell us the area classification of the installation at enquiry so the certified variant is quoted and the certificate matches the unit that arrives.

CONTACT US

If you have any queries, get in touch today! Don't hesitate. We try to take the extra step for our customer satisfaction.
Name
Email*
Message
Verification Code*
Click to verify
Leave a message
Name
Email*
Message
Verification Code*
Click to verify